| Assessment Year | 2011 |
|---|---|
| Principal Product | Compressors, Pumps, and Fans |
| NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
| SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 91 |
| Plant Area |
54,000
ft2
|
| Annual Production | 10,000
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $66,511 | 792,502 |
kWh
|
$0.084 |
| Electricity Demand | $35,341 | 2,299 |
kW-mo/yr
|
$15.37 |
| Electricity Fees | $6,159 | - |
|
- |
| Natural Gas | $9,679 | 1,100 |
MMBtu
|
$8.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,565 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7124: Make a practice of turning off lights when not needed | $5,207 | $100 |
$5,207
62,062
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,754 | $100 |
$1,754
20,907
kWh
|
- | |
| 03 | 2.2135: Repair and eliminate steam leaks | $2,193 | $300 |
$2,193
26,133
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $4,354 | $1,440 |
$4,354
51,896
kWh
|
- | |
| 05 | 2.6232: Install set-back timers | $1,411 | $1,000 |
$1,411
16,823
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45,218 | $46,656 |
$30,770
366,748
kWh
|
$14,448
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $60,137 | $49,596 |
$45,689
544,569
kWh
|
$14,448
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $10,565 | $1,500 |
$10,565
125,925
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs