ITAC Assessment: SD0508
ITAC logo
ITAC Assessment: SD0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Compressors, Pumps, and Fans
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 54,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,511 792,502
kWh
Electricity Demand $35,341 2,299
kW-mo/yr
Electricity Fees $6,159 -
Natural Gas $9,679 1,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7124: Make a practice of turning off lights when not needed $5,207 $100 $5,207
62,062
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,754 $100 $1,754
20,907
kWh
-
03 2.2135: Repair and eliminate steam leaks $2,193 $300 $2,193
26,133
kWh
-
04 2.7135: Install occupancy sensors $4,354 $1,440 $4,354
51,896
kWh
-
05 2.6232: Install set-back timers $1,411 $1,000 $1,411
16,823
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $45,218 $46,656 $30,770
366,748
kWh
$14,448
-
kW-mo/yr
TOTAL RECOMMENDED $60,137 $49,596 $45,689
544,569
kWh
$14,448
-
kW-mo/yr
TOTAL IMPLEMENTED $10,565 $1,500 $10,565
125,925
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs