| Assessment Year | 2015 |
|---|---|
| Principal Product | corrugated boxes |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | less than $500 k |
| # of Employees | 75 |
| Plant Area |
128,232
ft2
|
| Annual Production | 1,200
thousand feet
|
| Production Hrs. Annual | 6,292
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $129,661 | 1,500,664 |
kWh
|
$0.086 |
| Electricity Demand | $96,743 | 4,944 |
kW-mo/yr
|
$19.57 |
| Electricity Fees | $8,826 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $85,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $28,713 | $49,500 |
$15,346
177,640
kWh
|
$13,367
-
kW-mo/yr
|
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $23,017 | $11,740 |
$16,072
186,041
kWh
|
$6,945
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,049 | $1,200 |
$10,049
116,276
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,389 | $19,450 |
$9,350
108,222
kWh
|
$4,039
-
kW-mo/yr
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $3,299 | $10,489 |
$1,896
21,932
kWh
|
$1,403
-
kW-mo/yr
|
|
| 06 | 2.7135: Install occupancy sensors | $2,645 | $1,352 |
$2,645
30,614
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,573 | $3,100 |
$2,573
29,782
kWh
|
- | |
| 08 | 2.7134: Use photocell controls | $849 | $2,405 |
$702
8,121
kWh
|
$147
-
kW-mo/yr
|
|
| 09 | 2.4221: Install compressor air intakes in coolest locations | $659 | $361 |
$659
7,633
kWh
|
- | |
| TOTAL RECOMMENDED | $85,193 | $99,597 |
$59,292
686,261
kWh
|
$25,901
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs