ITAC Assessment: SD0494
ITAC logo
ITAC Assessment: SD0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Corrugated Paper
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range greater than $500
M
# of Employees 75
Plant Area 241,850
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $811,839 10,769,328
kWh
Electricity Demand $400,466 15,720
kW-mo/yr
Electricity Fees $142,722 -
Natural Gas $446,260 68,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $55,666 $90,550 - - $55,666
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $47,366 $73,800 $30,506
404,563
kWh
$16,860
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $11,773 $3,400 $11,773
268,173
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,501 $800 $3,501
46,426
kWh
- -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $2,199 $2,199 $1,083
14,363
kWh
$1,116
-
kW-mo/yr
-
TOTAL RECOMMENDED $120,505 $170,749 $46,863
733,525
kWh
$17,976
-
kW-mo/yr
$55,666
-
MMBtu
TOTAL IMPLEMENTED $62,640 $78,000 $45,780
719,162
kWh
$16,860
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs