ITAC Assessment: SD0489
ITAC logo
ITAC Assessment: SD0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lighting Fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range less than $500
k
# of Employees 125
Plant Area 193,000
ft2
Annual Production 80,001
pieces
Production Hrs. Annual 3,835
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,369 925,197
kWh
Electricity Demand $83,587 3,877
kW-mo/yr
Electricity Fees $12,251 -
Natural Gas $18,749 2,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $7,747 $8,360 $4,286
51,276
kWh
$3,461
-
kW-mo/yr
02 2.7135: Install occupancy sensors $7,664 $12,000 $7,664
91,672
kWh
-
03 2.4226: Use / purchase optimum sized compressor $4,939 $15,269 $2,733
32,691
kWh
$2,206
-
kW-mo/yr
04 2.7134: Use photocell controls $2,811 $8,510 $2,002
23,949
kWh
$809
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $434 $1,400 $252
2,996
kWh
$182
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $238 $200 $225
2,687
kWh
$13
-
kW-mo/yr
TOTAL RECOMMENDED $23,833 $45,739 $17,162
205,271
kWh
$6,671
-
kW-mo/yr
TOTAL IMPLEMENTED $8,419 $9,960 $4,763
56,959
kWh
$3,656
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs