ITAC Assessment: UA0251
ITAC logo
ITAC Assessment: UA0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Process Intrumentation
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 78,000
ft2
Annual Production 17,000
units
Production Hrs. Annual 6,732
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,469 3,614,800
kWh
Electricity Demand $166,395 8,929
kW-mo/yr
Electricity Fees $47,077 -
Natural Gas $4,353 311
MMBtu
TOTAL YEARLY COSTS $488,294
RECOMMENDED SAVINGS* $51,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,263 $2,002 $6,149
82,188
kWh
$2,213
-
kW-mo/yr
$901
02 2.4239: Eliminate or reduce compressed air usage $8,595 $100 $5,568
74,415
kWh
$2,191
-
kW-mo/yr
$836
03 2.3212: Optimize plant power factor $24,626 $4,208 - - $24,626
04 2.7261: Install timers and/or thermostats $7,062 $1,190 $6,375
85,206
kWh
- $687
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,641 $128 $973
13,005
kWh
$508
-
kW-mo/yr
$160
TOTAL RECOMMENDED $51,187 $7,628 $19,065
254,814
kWh
$4,912
-
kW-mo/yr
$27,210
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs