ITAC Assessment: SD0480
ITAC logo
ITAC Assessment: SD0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Hoists and Winches
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 237
Plant Area 105,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 5,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,423 1,828,010
kWh
Electricity Demand $102,294 4,279
kW-mo/yr
Electricity Fees $7,998 -
Natural Gas $16,902 2,397
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $102,356 $456,500 $67,455
1,246,875
kWh
$71,730
-
kW-mo/yr
$(-36,829.0)
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $58,476 $249,000 $46,284
624,609
kWh
$12,192
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $13,051 $52,333 $13,051
176,124
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,662 $300 $2,885
38,940
kWh
$777
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,971 $5,075 $1,440
19,431
kWh
$531
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,686 $4,500 $1,686
22,756
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,176 $3,050 $927
12,505
kWh
$249
-
kW-mo/yr
-
08 2.6231: Utilize controls to operate equipment only when needed $634 $370 $634
8,562
kWh
- -
TOTAL RECOMMENDED $183,012 $771,128 $134,362
2,149,802
kWh
$85,479
-
kW-mo/yr
$(-36,829.0)
-
MMBtu
TOTAL IMPLEMENTED $3,662 $300 $2,885
38,940
kWh
$777
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs