ITAC Assessment: MZ0335
ITAC logo
ITAC Assessment: MZ0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product performance material fabric for filters
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 51,000
ft2
Annual Production 24,600,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,853 7,364,222
kWh
Electricity Demand $179,605 15,414
kW-mo/yr
Natural Gas $293,478 87,116
MMBtu
Waste Disposal Costs
Water Usage $9,091 1,510
Tgal
Water Disposal $9,455 1,510
Tgal
TOTAL YEARLY COSTS $871,482
RECOMMENDED SAVINGS* $119,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $558 $480 $558
10,737
kWh
-
02 2.2437: Recover waste heat from equipment $4,654 $7,600 $4,654
89,507
kWh
-
03 2.2511: Insulate bare equipment $1,834 $680 $1,834
35,263
kWh
-
04 2.7135: Install occupancy sensors $701 $1,200 $701
13,482
kWh
-
05 2.9114: Use solar heat to make electricty $106,813 $957,388 $74,659
1,435,760
kWh
$32,154
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $759 $1,330 $524
10,080
kWh
$235
-
kW-mo/yr
07 2.4221: Install compressor air intakes in coolest locations $4,141 $9,100 $2,860
54,992
kWh
$1,281
-
kW-mo/yr
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $449 $200 $310
5,965
kWh
$139
-
kW-mo/yr
TOTAL RECOMMENDED $119,909 $977,978 $86,100
1,655,786
kWh
$33,809
-
kW-mo/yr
TOTAL IMPLEMENTED $8,506 $11,290 $8,271
159,069
kWh
$235
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs