ITAC Assessment: SD0477
ITAC logo
ITAC Assessment: SD0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product paint, printed products
NAICS 325510: Paint and Coating Manufacturing
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area 100,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,380
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,340 708,046
kWh
Electricity Demand $51,605 3,078
kW-mo/yr
Natural Gas $21,450 3,226
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,922 $17,910 $3,752
48,915
kWh
$2,170
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $2,803 $9,900 $1,669
21,769
kWh
$1,134
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $2,635 $4,905 - - $2,635
-
MMBtu
04 2.7134: Use photocell controls $2,407 $4,140 $1,522
19,845
kWh
$885
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $2,263 $200 $1,274
16,607
kWh
$989
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,737 $5,300 $1,737
22,653
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $646 $300 $646
8,418
kWh
- -
TOTAL RECOMMENDED $18,413 $42,655 $10,600
138,207
kWh
$5,178
-
kW-mo/yr
$2,635
-
MMBtu
TOTAL IMPLEMENTED $2,263 $200 $1,274
16,607
kWh
$989
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs