| Assessment Year | 2013 |
|---|---|
| Principal Product | Treated Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $100 M to 500M |
| # of Employees | 145 |
| Plant Area |
47,916,000
ft2
|
| Annual Production | 16,425,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $5,009,337 | 75,304,281 |
kWh
|
$0.067 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,808,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $901,898 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|
| 01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $889,050 | $2,250,000 | - | $889,050 | |
| 02 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $857,166 | $2,630,000 |
$857,166
16,644,000
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $46,350 | $106,000 |
$46,350
696,999
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,519 | $18,224 |
$6,519
98,017
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $6,329 | $3,400 |
$6,329
95,182
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $2,607 | $4,865 |
$2,607
39,210
kWh
|
- | |
| TOTAL RECOMMENDED | $1,808,021 | $5,012,489 |
$918,971
17,573,408
kWh
|
$889,050 | ||
| TOTAL IMPLEMENTED | $901,898 | $2,271,624 |
$12,848
193,199
kWh
|
$889,050 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs