Assessment Year | 1987 |
---|---|
Principal Product | ELECTRIC CABLE |
NAICS |
n/a
|
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 4,800
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $321,414 | 5,582,063 |
kWh
|
$0.058 |
Natural Gas | $76,795 | 18,931 |
MMBtu
|
$4.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,100 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,460 | - | - |
$4,660
-
MMBtu
|
$(-1,200.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $812 | $275 |
$812
14,947
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,126 | $84 |
$5,550
115,768
kWh
|
- | $576 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $162 | $75 |
$162
3,224
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $532 | $855 |
$532
11,137
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $4,210 | $1,390 |
$4,210
97,890
kWh
|
- | - | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $190 | $161 | - |
$190
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $818 | $723 | - |
$818
-
MMBtu
|
- | |
09 | 2.7261: Install timers and/or thermostats | $1,790 | $665 | - |
$1,790
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $18,100 | $4,228 |
$11,266
242,966
kWh
|
$7,458
-
MMBtu
|
$(-624.0) | ||
TOTAL IMPLEMENTED | $18,100 | $4,228 |
$11,266
242,966
kWh
|
$7,458
-
MMBtu
|
$(-624.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs