ITAC Assessment: LT0103
ITAC logo
ITAC Assessment: LT0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECTRIC CABLE
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 4,800
ton
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,414 5,582,063
kWh
Natural Gas $76,795 18,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,460 - - $4,660
-
MMBtu
$(-1,200.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $812 $275 $812
14,947
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,126 $84 $5,550
115,768
kWh
- $576
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $162 $75 $162
3,224
kWh
- -
05 2.4133: Use most efficient type of electric motors $532 $855 $532
11,137
kWh
- -
06 2.2511: Insulate bare equipment $4,210 $1,390 $4,210
97,890
kWh
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $190 $161 - $190
-
MMBtu
-
08 2.2511: Insulate bare equipment $818 $723 - $818
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $1,790 $665 - $1,790
-
MMBtu
-
TOTAL RECOMMENDED $18,100 $4,228 $11,266
242,966
kWh
$7,458
-
MMBtu
$(-624.0)
TOTAL IMPLEMENTED $18,100 $4,228 $11,266
242,966
kWh
$7,458
-
MMBtu
$(-624.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs