Assessment Year | 2012 |
---|---|
Principal Product | Metal Enclosures |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
45,600
ft2
|
Annual Production | 15,000
units
|
Production Hrs. Annual | 5,954
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $130,458 | 1,241,281 |
kWh
|
$0.11 |
Electricity Demand | $29,000 | 2,992 |
kW-mo/yr
|
$9.69 |
Electricity Fees | $11,899 | - |
|
- |
Natural Gas | $52,862 | 8,297 |
MMBtu
|
$6.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,269 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,269 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $591 | $100 |
$591
5,627
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,935 | $2,500 |
$7,935
75,500
kWh
|
- | - | |
03 | 2.7131: Add area lighting switches | $420 | $115 |
$420
3,993
kWh
|
- | - | |
04 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $1,443 | $618 | - | - |
$1,443
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,415 | $800 |
$1,260
12,000
kWh
|
$155
-
kW-mo/yr
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,400 | $2,500 |
$(-72.0)
(-687)
kWh
|
- |
$3,472
-
MMBtu
|
|
07 | 2.4226: Use / purchase optimum sized compressor | $3,010 | $2,500 |
$3,010
28,620
kWh
|
- | - | |
08 | 2.7134: Use photocell controls | $1,660 | $2,700 |
$1,660
15,794
kWh
|
- | - | |
09 | 2.7135: Install occupancy sensors | $395 | $989 |
$395
3,757
kWh
|
- | - | |
TOTAL RECOMMENDED | $20,269 | $12,822 |
$15,199
144,604
kWh
|
$155
-
kW-mo/yr
|
$4,915
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,269 | $12,822 |
$15,199
144,604
kWh
|
$155
-
kW-mo/yr
|
$4,915
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs