Assessment Year | 2012 |
---|---|
Principal Product | Treated Waste Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4941: Water Supply |
Sales Range | less than $500 k |
# of Employees | 14 |
Plant Area |
10,000
ft2
|
Annual Production | 22
units
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,837,672 | 36,241,024 |
kWh
|
$0.078 |
Electricity Demand | $1,075,101 | 77,541 |
kW-mo/yr
|
$13.86 |
Electricity Fees | $(-90,329.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,754 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,647 | $100 |
$1,647
21,380
kWh
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $20,436 | $21,000 |
$20,436
261,000
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,738 | $16,500 |
$15,738
201,000
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $2,451 | $2,800 |
$2,451
31,300
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,220 | $4,100 |
$1,790
22,860
kWh
|
$430
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $42,492 | $44,500 |
$42,062
537,540
kWh
|
$430
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $26,754 | $28,000 |
$26,324
336,540
kWh
|
$430
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs