ITAC Assessment: SD0441
ITAC logo
ITAC Assessment: SD0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Treated Waste Water
NAICS 221320: Sewage Treatment Facilities
SIC 4941: Water Supply
Sales Range less than $500
k
# of Employees 14
Plant Area 10,000
ft2
Annual Production 22
units
Production Hrs. Annual 3,640
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,837,672 36,241,024
kWh
Electricity Demand $1,075,101 77,541
kW-mo/yr
Electricity Fees $(-90,329.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,647 $100 $1,647
21,380
kWh
-
02 2.4226: Use / purchase optimum sized compressor $20,436 $21,000 $20,436
261,000
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,738 $16,500 $15,738
201,000
kWh
-
04 2.7135: Install occupancy sensors $2,451 $2,800 $2,451
31,300
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,220 $4,100 $1,790
22,860
kWh
$430
-
kW-mo/yr
TOTAL RECOMMENDED $42,492 $44,500 $42,062
537,540
kWh
$430
-
kW-mo/yr
TOTAL IMPLEMENTED $26,754 $28,000 $26,324
336,540
kWh
$430
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs