| Assessment Year | 2009 |
|---|---|
| Principal Product | Plastic Injection Molded Parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
100,000
ft2
|
| Annual Production | 43,000,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,130,721 | 15,484,102 |
kWh
|
$0.14 |
| Electricity Demand | $361,836 | 29,049 |
kW-mo/yr
|
$12.46 |
| Electricity Fees | $176,340 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,101 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,440 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,200 | $14,950 |
$11,200
81,394
kWh
|
- | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,396 | $4,950 |
$4,396
31,950
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $4,265 | $5,257 |
$3,641
26,458
kWh
|
$624
-
kW-mo/yr
|
|
| 04 | 2.6218: Turn off equipment when not in use | $2,637 | $1,400 |
$2,637
19,164
kWh
|
- | |
| 05 | 2.4225: Install common header on compressors | $10,623 | $16,000 |
$8,368
60,815
kWh
|
$2,255
-
kW-mo/yr
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,980 | $26,700 |
$14,980
108,869
kWh
|
- | |
| TOTAL RECOMMENDED | $48,101 | $69,257 |
$45,222
328,650
kWh
|
$2,879
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $39,440 | $59,050 |
$37,185
270,242
kWh
|
$2,255
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs