ITAC Assessment: SD0414
ITAC logo
ITAC Assessment: SD0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plastic Injection Molded Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 43,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,130,721 15,484,102
kWh
Electricity Demand $361,836 29,049
kW-mo/yr
Electricity Fees $176,340 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,200 $14,950 $11,200
81,394
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,396 $4,950 $4,396
31,950
kWh
-
03 2.4133: Use most efficient type of electric motors $4,265 $5,257 $3,641
26,458
kWh
$624
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $2,637 $1,400 $2,637
19,164
kWh
-
05 2.4225: Install common header on compressors $10,623 $16,000 $8,368
60,815
kWh
$2,255
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,980 $26,700 $14,980
108,869
kWh
-
TOTAL RECOMMENDED $48,101 $69,257 $45,222
328,650
kWh
$2,879
-
kW-mo/yr
TOTAL IMPLEMENTED $39,440 $59,050 $37,185
270,242
kWh
$2,255
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs