Assessment Year | 2005 |
---|---|
Principal Product | Fiber optic cable |
NAICS | 335921: Fiber Optic Cable Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
395,000
ft2
|
Annual Production | 3,280,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $309,111 | 10,792,320 |
kWh
|
$0.029 |
Electricity Demand | $231,340 | 23,318 |
kW-mo/yr
|
$9.92 |
Electricity Fees | $16,025 | - |
|
- |
Natural Gas | $101,066 | 11,426 |
MMBtu
|
$8.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,413 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $102,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.451: Add additional production shift | $89,630 | $5,000 |
$(-4,747.0)
(-939,110)
kWh
|
$92,536
-
kW-mo/yr
|
$1,841 | - | - | - | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $9,148 | $21,000 |
$2,546
88,922
kWh
|
$5,902
-
kW-mo/yr
|
- | - | $700 | - | - | |
03 | 3.1182: Make a new by-product | $15,600 | $1,000 | - | - | - | - | - | - | $15,600 | |
04 | 2.4226: Use / purchase optimum sized compressor | $2,268 | $6,500 |
$2,268
79,200
kWh
|
- | - | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,767 | $100 |
$1,343
46,880
kWh
|
$1,324
-
kW-mo/yr
|
- | $(-600.0) | - | $(-300.0) | - | |
TOTAL RECOMMENDED | $118,413 | $33,600 |
$1,410
(-724,108)
kWh
|
$99,762
-
kW-mo/yr
|
$1,841 | $(-600.0) | $700 | $(-300.0) | $15,600 | ||
TOTAL IMPLEMENTED | $102,813 | $32,600 |
$1,410
(-724,108)
kWh
|
$99,762
-
kW-mo/yr
|
$1,841 | $(-600.0) | $700 | $(-300.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs