| Assessment Year | 2008 |
|---|---|
| Principal Product | Pork Rinds |
| NAICS | 311919: Other Snack Food Manufacturing |
| SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
| Sales Range | $10 M to 50M |
| # of Employees | 73 |
| Plant Area |
27,500
ft2
|
| Annual Production | 9,000,000
lb
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,444 | 558,560 |
kWh
|
$0.083 |
| Electricity Demand | $21,615 | 1,400 |
kW-mo/yr
|
$15.44 |
| Electricity Fees | $7,479 | - |
|
- |
| LPG | $77,786 | 9,025 |
MMBtu
|
$8.62 |
| Other Gas | $6,291 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,943 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $36,255 | $192,000 |
$37,939
456,000
kWh
|
$21,615
-
kW-mo/yr
|
- |
$(-20,991.0)
-
MMBtu
|
$(-2,308.0) | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $3,543 | $8,540 | - | - |
$3,543
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,066 | $6,344 |
$2,236
26,880
kWh
|
$830
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,423 | $6,590 |
$1,037
12,462
kWh
|
$386
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,387 | $2,539 |
$1,387
16,673
kWh
|
- | - | - | - | |
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $1,067 | $183 |
$1,067
12,822
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $46,741 | $216,196 |
$43,666
524,837
kWh
|
$22,831
-
kW-mo/yr
|
$3,543
-
MMBtu
|
$(-20,991.0)
-
MMBtu
|
$(-2,308.0) | ||
| TOTAL IMPLEMENTED | $6,943 | $15,656 |
$5,727
68,837
kWh
|
$1,216
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs