ITAC Assessment: SD0409
ITAC logo
ITAC Assessment: SD0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pork Rinds
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area 27,500
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,444 558,560
kWh
Electricity Demand $21,615 1,400
kW-mo/yr
Electricity Fees $7,479 -
LPG $77,786 9,025
MMBtu
Other Gas $6,291 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $36,255 $192,000 $37,939
456,000
kWh
$21,615
-
kW-mo/yr
- $(-20,991.0)
-
MMBtu
$(-2,308.0)
02 2.2414: Use waste heat from hot flue gases to preheat $3,543 $8,540 - - $3,543
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,066 $6,344 $2,236
26,880
kWh
$830
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,423 $6,590 $1,037
12,462
kWh
$386
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,387 $2,539 $1,387
16,673
kWh
- - - -
06 2.6231: Utilize controls to operate equipment only when needed $1,067 $183 $1,067
12,822
kWh
- - - -
TOTAL RECOMMENDED $46,741 $216,196 $43,666
524,837
kWh
$22,831
-
kW-mo/yr
$3,543
-
MMBtu
$(-20,991.0)
-
MMBtu
$(-2,308.0)
TOTAL IMPLEMENTED $6,943 $15,656 $5,727
68,837
kWh
$1,216
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs