ITAC Assessment: SD0408
ITAC logo
ITAC Assessment: SD0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Underwater Lights
NAICS 335129: Other Lighting Equipment Manufacturing
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 35,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,417 216,686
kWh
Electricity Demand $12,511 1,007
kW-mo/yr
Electricity Fees $499 -
Natural Gas $365 31
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $47,619 $223,150 $32,704
365,000
kWh
$14,915
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $1,994 $2,875 $1,994
12,476
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,149 $5,702 $839
9,338
kWh
$1,310
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,048 $4,720 $588
6,543
kWh
$460
-
kW-mo/yr
05 2.7145: Install skylights $431 $2,016 $245
2,734
kWh
$186
-
kW-mo/yr
06 2.7135: Install occupancy sensors $83 $246 $83
918
kWh
-
TOTAL RECOMMENDED $53,324 $238,709 $36,453
397,009
kWh
$16,871
-
kW-mo/yr
TOTAL IMPLEMENTED $5,274 $13,543 $3,504
29,275
kWh
$1,770
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs