ITAC Assessment: SD0396
ITAC logo
ITAC Assessment: SD0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Vinyl Windows and Doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 230
Plant Area 111,111
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,742 1,941,618
kWh
Electricity Demand $87,629 5,705
kW-mo/yr
Electricity Fees $12,982 -
Natural Gas $9,144 912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,984 $280 $10,038
114,138
kWh
$4,946
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,283 $28,500 $14,025
159,375
kWh
$6,912
-
kW-mo/yr
$(-6,654.0)
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $1,115 $200 $1,115
12,682
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,509 $2,200 $2,509
28,534
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $945 $1,000 $945
10,741
kWh
- -
TOTAL RECOMMENDED $33,836 $32,180 $28,632
325,470
kWh
$11,858
-
kW-mo/yr
$(-6,654.0)
-
MMBtu
TOTAL IMPLEMENTED $17,737 $31,700 $17,479
198,650
kWh
$6,912
-
kW-mo/yr
$(-6,654.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs