ITAC Assessment: MS0319
ITAC logo
ITAC Assessment: MS0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Upholster Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 422
Plant Area 222,000
ft2
Annual Production 177,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,506 1,535,040
kWh
Electricity Demand $84,111 7,776
kW-mo/yr
Electricity Fees $3,471 -
Natural Gas $5,341 421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,027 $33,573 $6,375
140,511
kWh
$9,415
-
kW-mo/yr
$237
02 2.7229: Air condition only space necessary $1,775 $240 $441
9,720
kWh
$1,307
-
kW-mo/yr
$27
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,637 $8,907 $651
14,347
kWh
$962
-
kW-mo/yr
$24
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $855 $144 $843
18,559
kWh
- $12
05 2.8121: Apply for tax-free status for energy purchases $650 $50 - - $650
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $477 $4,740 $156
3,442
kWh
$314
-
kW-mo/yr
$7
TOTAL RECOMMENDED $21,421 $47,654 $8,466
186,579
kWh
$11,998
-
kW-mo/yr
$957
TOTAL IMPLEMENTED $3,619 $13,841 $1,650
36,348
kWh
$1,276
-
kW-mo/yr
$693
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs