ITAC Assessment: MA0306
ITAC logo
ITAC Assessment: MA0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product specialty wire brushes
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 60,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 4,271
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,987 1,159,144
kWh
Natural Gas $15,626 2,125
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1331: Burn a less expensive grade of fuel $29,061 $21,690 $22,894
208,968
kWh
$6,167
-
MMBtu
02 2.7491: Insulate glazing, walls, ceilings, and roofs $6,295 $6,831 $6,295
57,444
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,696 - $5,696
53,634
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,761 $5,827 $2,761
25,205
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $2,190 $2,829 - $2,190
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,028 $519 $1,028
9,379
kWh
-
07 2.2136: Install / repair insulation on steam lines $757 $434 - $757
-
MMBtu
TOTAL RECOMMENDED $47,788 $38,130 $38,674
354,630
kWh
$9,114
-
MMBtu
TOTAL IMPLEMENTED $44,570 $34,782 $37,646
345,251
kWh
$6,924
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs