ITAC Assessment: SD0390
ITAC logo
ITAC Assessment: SD0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,635 5,051,240
kWh
Electricity Demand $163,336 8,037
kW-mo/yr
Natural Gas $708,553 69,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $171,093 $182,800 $183,933
2,851,680
kWh
$111,435
-
kW-mo/yr
$(-99,024.0)
-
MMBtu
$(-25,251.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,435 $42,808 $14,263
221,126
kWh
$6,172
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $14,632 $13,345 - - $14,632
-
MMBtu
-
04 2.7134: Use photocell controls $9,145 $1,404 $3,354
52,014
kWh
$5,791
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $3,469 $6,600 $2,250
87,176
kWh
$1,219
-
kW-mo/yr
- -
06 2.4224: Upgrade controls on compressors $3,452 $168 $3,452
53,533
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,382 $120 $2,366
36,691
kWh
$1,016
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,427 $5,265 $1,696
26,295
kWh
$731
-
kW-mo/yr
- -
TOTAL RECOMMENDED $228,035 $252,510 $211,314
3,328,515
kWh
$126,364
-
kW-mo/yr
$(-84,392.0)
-
MMBtu
$(-25,251.0)
TOTAL IMPLEMENTED $29,783 $54,841 $21,661
388,130
kWh
$8,122
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs