ITAC Assessment: SD0366
ITAC logo
ITAC Assessment: SD0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product plastic products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 110,000
pieces
Production Hrs. Annual 4,284
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,569 1,070,948
kWh
Electricity Demand $44,474 6,985
kW-mo/yr
Natural Gas $20,948 25,776
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $123,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,915 $3,400 $1,546
15,845
kWh
$369
-
kW-mo/yr
- - - -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,670 $75 $1,670
17,130
kWh
- - - - -
03 2.2511: Insulate bare equipment $1,553 $200 $1,553
15,912
kWh
- - - - -
04 2.4235: Remove or close off unneeded compressed air lines $1,250 $160 $1,054
10,749
kWh
$196
-
kW-mo/yr
- - - -
05 2.6231: Utilize controls to operate equipment only when needed $1,172 $900 $860
8,808
kWh
$312
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $695 - $695
7,126
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,771 $17,633 $12,510
128,177
kWh
$2,261
-
kW-mo/yr
- - - -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,248 $10,000 - - $5,248
-
lb
- - -
09 3.5313: Increase amount of waste recovered for resale $19,018 $24,500 - - - - - $19,018
10 4.322: Eliminate old stock and modify inventory control $98,038 $1,964 - - - - $98,038 -
11 4.441: Install automatic packing equipment $2,758 $3,500 - - - $2,758 - -
TOTAL RECOMMENDED $148,088 $62,332 $19,888
203,747
kWh
$3,138
-
kW-mo/yr
$5,248
-
lb
$2,758 $98,038 $19,018
TOTAL IMPLEMENTED $123,429 $30,199 $3,419
35,005
kWh
$196
-
kW-mo/yr
- $2,758 $98,038 $19,018
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs