ITAC Assessment: UD0970
ITAC logo
ITAC Assessment: UD0970
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printing Ink
NAICS 325910: Printing Ink Manufacturing
SIC 2893: Printing Ink
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 80,000
ft2
Annual Production 30,800,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,764 3,516,000
kWh
Electricity Demand $117,822 7,632
kW-mo/yr
Electricity Fees $1,236 -
Natural Gas $39,006 16,150
MMBtu
Waste Disposal Costs
Water Usage $4,201 162
Tgal
Water Disposal $3,911 162
Tgal
TOTAL YEARLY COSTS $316,940
RECOMMENDED SAVINGS* $19,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2628: Utilize a less expensive cooling method $570 - $570
13,338
kWh
- - -
02 2.7224: Reduce space conditioning during non-working hours $142 - $44
1,030
kWh
- $98
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,577 $49,400 $9,275
217,056
kWh
$4,791
-
kW-mo/yr
- $511
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,698 $2,000 $1,698
39,732
kWh
- - -
05 2.7131: Add area lighting switches $541 $250 $244
5,715
kWh
$177
-
kW-mo/yr
- $120
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,745 $1,000 $1,149
26,990
kWh
$596
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $298 $1,000 $298
6,975
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $164 $50 $108
2,520
kWh
$56
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,735 $53,700 $13,386
313,356
kWh
$5,620
-
kW-mo/yr
$98
-
MMBtu
$631
TOTAL IMPLEMENTED $1,551 $1,250 $1,156
27,058
kWh
$177
-
kW-mo/yr
$98
-
MMBtu
$120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings