ITAC Assessment: UU0061
ITAC logo
ITAC Assessment: UU0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product alarms light bars
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 80,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,421 1,495,760
kWh
Electricity Demand $8,654 3,170
kW-mo/yr
Electricity Fees $2,477 -
Natural Gas $3,672 5,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,895 $18,633 $2,390
73,100
kWh
$505
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $267 $1,000 $220
6,800
kWh
$47
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $274 - $102
3,100
kWh
$172
-
kW-mo/yr
-
04 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $18,030 $11,000 - - $18,030
05 4.612: Contract out maintenance $15,000 $2,000 - - $15,000
06 4.513: Re-arrange equipment layout to reduce labor costs $351 $432 - - $351
TOTAL RECOMMENDED $36,817 $33,065 $2,712
83,000
kWh
$724
-
kW-mo/yr
$33,381
TOTAL IMPLEMENTED $625 $432 $102
3,100
kWh
$172
-
kW-mo/yr
$351
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs