ITAC Assessment: SD0337
ITAC logo
ITAC Assessment: SD0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Print newspapers
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 29,000
ft2
Annual Production 365
pieces
Production Hrs. Annual 8,372
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,876 1,575,669
kWh
Electricity Demand $66,171 4,920
kW-mo/yr
Natural Gas $1,186 141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,690 $3,091 $1,125
12,500
kWh
$565
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,582 - $1,582
17,581
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,381 $240 $1,381
15,348
kWh
- - -
04 2.6231: Utilize controls to operate equipment only when needed $1,173 $875 $1,173
13,034
kWh
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,680 $10,000 - - $7,680
-
lb
-
06 4.441: Install automatic packing equipment $6,303 $3,500 - - - $6,303
TOTAL RECOMMENDED $19,809 $17,706 $5,261
58,463
kWh
$565
-
kW-mo/yr
$7,680
-
lb
$6,303
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs