Assessment Year | 2004 |
---|---|
Principal Product | Print newspapers |
NAICS | 511110: Newspaper Publishers |
SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
29,000
ft2
|
Annual Production | 365
pieces
|
Production Hrs. Annual | 8,372
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,876 | 1,575,669 |
kWh
|
$0.090 |
Electricity Demand | $66,171 | 4,920 |
kW-mo/yr
|
$13.45 |
Natural Gas | $1,186 | 141 |
MMBtu
|
$8.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,690 | $3,091 |
$1,125
12,500
kWh
|
$565
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,582 | - |
$1,582
17,581
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,381 | $240 |
$1,381
15,348
kWh
|
- | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $1,173 | $875 |
$1,173
13,034
kWh
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,680 | $10,000 | - | - |
$7,680
-
lb
|
- | |
06 | 4.441: Install automatic packing equipment | $6,303 | $3,500 | - | - | - | $6,303 | |
TOTAL RECOMMENDED | $19,809 | $17,706 |
$5,261
58,463
kWh
|
$565
-
kW-mo/yr
|
$7,680
-
lb
|
$6,303 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs