ITAC Assessment: SD0334
ITAC logo
ITAC Assessment: SD0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Metal Stampings
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 2469:
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 55,000
ft2
Annual Production 3,600,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,577 1,057,780
kWh
Electricity Demand $32,381 3,826
kW-mo/yr
Natural Gas $1,432 171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4226: Use / purchase optimum sized compressor $19,914 $22,746 $16,124
132,602
kWh
$3,790
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,538 $31,523 $10,178
83,700
kWh
$2,360
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $12,279 $390 $8,805
81,823
kWh
$3,474
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $9,714 $2,420 $7,887
64,857
kWh
$1,827
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,008 $10,250 $3,648
30,000
kWh
$1,218
-
kW-mo/yr
$1,142
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,155 - $3,155
25,943
kWh
- - -
07 3.3131: Use evaporation to concentrate material $641 $380 $641
5,273
kWh
- - -
08 3.5217: Reuse / recycle/ sell paper products $7,320 $6,000 - - - $7,320
-
lb
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,200 $10,000 - - - $4,200
-
lb
TOTAL RECOMMENDED $75,769 $83,709 $50,438
424,198
kWh
$12,669
-
kW-mo/yr
$1,142
-
MMBtu
$11,520
-
lb
TOTAL IMPLEMENTED $45,372 $55,039 $35,748
303,398
kWh
$9,624
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs