| Assessment Year | 1995 |
|---|---|
| Principal Product | Forgings (hand tools) |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $5 M to 10M |
| # of Employees | 49 |
| Plant Area |
115,000
ft2
|
| Annual Production | 1,100
ton
|
| Production Hrs. Annual | 2,100
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $111,051 | 1,282,532 |
kWh
|
$0.087 |
| Natural Gas | $127,495 | 49,968 |
MMBtu
|
$2.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,981 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,254 | $270 |
$3,254
37,515
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $891 | $3,960 |
$891
10,258
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $470 | $909 |
$470
5,569
kWh
|
- | - | |
| 04 | 2.2515: Use optimum thickness insulation | $1,323 | $1,461 | - |
$1,323
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $764 | - |
$764
8,792
kWh
|
- | - | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $404 | - |
$404
-
kWh
|
- | - | |
| 07 | 3.4114: Replace city water with recycled water via cooling tower | $4,500 | $7,000 | - | - |
$4,500
-
Tgal
|
|
| TOTAL RECOMMENDED | $11,606 | $13,600 |
$5,783
62,134
kWh
|
$1,323
-
MMBtu
|
$4,500
-
Tgal
|
||
| TOTAL IMPLEMENTED | $4,981 | $1,731 |
$3,658
37,515
kWh
|
$1,323
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs