ITAC Assessment: SD0320
ITAC logo
ITAC Assessment: SD0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Stone coated steel roofing
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 3,200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,903 1,409,296
kWh
Electricity Demand $36,691 4,433
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $13,532 - $11,861
98,188
kWh
$1,671
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,385 $240 $4,725
39,120
kWh
$660
-
kW-mo/yr
- -
03 2.4131: Size electric motors for peak operating efficiency $4,863 $1,670 $4,124
34,146
kWh
$739
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $3,957 $1,185 $3,957
32,760
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,692 $2,961 $2,101
17,388
kWh
$591
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $1,621 $500 $1,621
13,420
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,327 $1,412 $1,167
9,660
kWh
$160
-
kW-mo/yr
- -
08 2.7134: Use photocell controls $1,032 $2,000 $652
5,400
kWh
$380
-
kW-mo/yr
- -
09 4.111: Add equipment/ operators to reduce production bottleneck $31,334 $6,000 - - - $31,334
10 3.5316: Contract a wood pallet recycling company $9,120 - - - $9,120
-
lb
-
TOTAL RECOMMENDED $74,863 $15,968 $30,208
250,082
kWh
$4,201
-
kW-mo/yr
$9,120
-
lb
$31,334
TOTAL IMPLEMENTED $59,848 $12,298 $25,432
210,536
kWh
$3,082
-
kW-mo/yr
- $31,334
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs