ITAC Assessment: AS0373
ITAC logo
ITAC Assessment: AS0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Heat Treating
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 43
Plant Area 42,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 7,467
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,342 4,825,000
kWh
Electricity Demand $21,110 13,190
kW-mo/yr
Electricity Fees $24,719 -
Natural Gas $230,225 34,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,560 $8,230 $914
19,793
kWh
$203
-
kW-mo/yr
- $443
02 2.4133: Use most efficient type of electric motors $504 $456 $437
9,457
kWh
$67
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $337 $1,400 $240
5,191
kWh
$97
-
kW-mo/yr
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $28,518 $60,100 $34,499
746,700
kWh
$10,632
-
kW-mo/yr
$(-16,613.0)
-
MMBtu
-
05 2.2441: Preheat boiler makeup water with waste process heat $1,794 $3,500 - - $1,794
-
MMBtu
-
TOTAL RECOMMENDED $32,713 $73,686 $36,090
781,141
kWh
$10,999
-
kW-mo/yr
$(-14,819.0)
-
MMBtu
$443
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs