Assessment Year | 2004 |
---|---|
Principal Product | Heat Treating |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 43 |
Plant Area |
42,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 7,467
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,342 | 4,825,000 |
kWh
|
$0.063 |
Electricity Demand | $21,110 | 13,190 |
kW-mo/yr
|
$1.60 |
Electricity Fees | $24,719 | - |
|
- |
Natural Gas | $230,225 | 34,258 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,713 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,560 | $8,230 |
$914
19,793
kWh
|
$203
-
kW-mo/yr
|
- | $443 | |
02 | 2.4133: Use most efficient type of electric motors | $504 | $456 |
$437
9,457
kWh
|
$67
-
kW-mo/yr
|
- | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $337 | $1,400 |
$240
5,191
kWh
|
$97
-
kW-mo/yr
|
- | - | |
04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $28,518 | $60,100 |
$34,499
746,700
kWh
|
$10,632
-
kW-mo/yr
|
$(-16,613.0)
-
MMBtu
|
- | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $1,794 | $3,500 | - | - |
$1,794
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $32,713 | $73,686 |
$36,090
781,141
kWh
|
$10,999
-
kW-mo/yr
|
$(-14,819.0)
-
MMBtu
|
$443 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs