Assessment Year | 2002 |
---|---|
Principal Product | Injection molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
28,000
ft2
|
Annual Production | 3,360,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,162 | 1,760,840 |
kWh
|
$0.11 |
Electricity Demand | $36,663 | 4,376 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $720 | - |
|
- |
Natural Gas | $653 | 62 |
MMBtu
|
$10.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,063 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,897 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,601 | $40,000 |
$33,014
305,691
kWh
|
$3,587
-
kW-mo/yr
|
- | - | - | |
02 | 2.6218: Turn off equipment when not in use | $10,981 | $1,000 |
$9,909
91,753
kWh
|
$1,072
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,955 | $4,712 |
$5,109
47,308
kWh
|
$846
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $1,379 | $500 |
$851
7,875
kWh
|
$528
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $878 | - |
$792
7,335
kWh
|
$86
-
kW-mo/yr
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $3,766 | $616 |
$3,766
34,875
kWh
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,500 | $5,000 | - | - |
$2,500
-
lb
|
- | - | |
08 | 3.2176: Increase use of automation | $5,965 | $3,500 | - | - | - | $5,965 | - | |
09 | 2.4226: Use / purchase optimum sized compressor | $2,019 | $5,500 | - | - | - | - | $2,019 | |
10 | 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance | $2,019 | $5,800 | - | - | - | - | $2,019 | |
TOTAL RECOMMENDED | $72,063 | $66,628 |
$53,441
494,837
kWh
|
$6,119
-
kW-mo/yr
|
$2,500
-
lb
|
$5,965 | $4,038 | ||
TOTAL IMPLEMENTED | $15,897 | $12,300 |
$10,701
99,088
kWh
|
$1,158
-
kW-mo/yr
|
- | - | $4,038 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |