ITAC Assessment: UM0324
ITAC logo
ITAC Assessment: UM0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product compounded plastic resin
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $100
M
to 500
M
# of Employees 147
Plant Area 250,000
ft2
Annual Production 170,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,386,556 27,138,785
kWh
Electricity Demand $473,863 65,156
kW-mo/yr
Electricity Fees $23,149 -
Natural Gas $70,379 7,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4239: Eliminate or reduce compressed air usage $6,396 $2,140 $5,022
98,299
kWh
$1,374
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $5,954 $543 $5,954
85,849
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,631 $4,000 $2,853
55,838
kWh
$778
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,978 - $2,338
45,770
kWh
$640
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $7,222 $6,917 - - $7,222
TOTAL RECOMMENDED $26,181 $13,600 $16,167
285,756
kWh
$2,792
-
kW-mo/yr
$7,222
TOTAL IMPLEMENTED $10,200 $6,917 $2,338
45,770
kWh
$640
-
kW-mo/yr
$7,222
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs