Assessment Year | 2002 |
---|---|
Principal Product | electronic boards |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
50,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,113
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,134 | 711,690 |
kWh
|
$0.11 |
Electricity Demand | $23,315 | 2,826 |
kW-mo/yr
|
$8.25 |
Electricity Fees | $720 | - |
|
- |
Natural Gas | $545 | 91 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,241 | - |
$959
9,085
kWh
|
$282
-
kW-mo/yr
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $3,815 | $1,000 |
$3,815
36,125
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,012 | $200 |
$2,315
21,924
kWh
|
$697
-
kW-mo/yr
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $19,200 | $2,000 | - | - |
$19,200
-
lb
|
- | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $940 | $2,000 | - | - |
$940
-
lb
|
- | |
06 | 2.8123: Pay utility bills on time | $530 | - | - | - | - | $530 | |
TOTAL RECOMMENDED | $28,738 | $5,200 |
$7,089
67,134
kWh
|
$979
-
kW-mo/yr
|
$20,140
-
lb
|
$530 | ||
TOTAL IMPLEMENTED | $23,983 | $2,200 |
$3,274
31,009
kWh
|
$979
-
kW-mo/yr
|
$19,200
-
lb
|
$530 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs