ITAC Assessment: SD0292
ITAC logo
ITAC Assessment: SD0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product electronic boards
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,113
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,134 711,690
kWh
Electricity Demand $23,315 2,826
kW-mo/yr
Electricity Fees $720 -
Natural Gas $545 91
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,738 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,241 - $959
9,085
kWh
$282
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $3,815 $1,000 $3,815
36,125
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,012 $200 $2,315
21,924
kWh
$697
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $19,200 $2,000 - - $19,200
-
lb
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $940 $2,000 - - $940
-
lb
-
06 2.8123: Pay utility bills on time $530 - - - - $530
TOTAL RECOMMENDED $28,738 $5,200 $7,089
67,134
kWh
$979
-
kW-mo/yr
$20,140
-
lb
$530
TOTAL IMPLEMENTED $23,983 $2,200 $3,274
31,009
kWh
$979
-
kW-mo/yr
$19,200
-
lb
$530
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs