ITAC Assessment: SD0284
ITAC logo
ITAC Assessment: SD0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product metal products for contruction of buildings
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 140,000
ft2
Annual Production 84,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,660 2,520,524
kWh
Electricity Demand $55,946 7,146
kW-mo/yr
Electricity Fees $2,784 -
Natural Gas $12,645 1,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $346,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $182,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $35,467 $2,580 $29,811
377,471
kWh
$5,656
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $16,645 $20,000 $16,645
193,098
kWh
- - - -
03 2.4239: Eliminate or reduce compressed air usage $8,020 $4,000 $6,816
79,067
kWh
$1,204
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,223 $30,000 $11,511
133,542
kWh
$2,712
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,771 - $5,567
71,377
kWh
$1,204
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $23,814 $1,000 $19,896
246,996
kWh
$3,918
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $6,639 $240 $6,639
77,014
kWh
- - - -
08 2.6218: Turn off equipment when not in use $30,429 - $25,859
299,991
kWh
$4,570
-
kW-mo/yr
- - -
09 3.3122: Use filtration, centrifuging to remove contaminants $7,125 $2,000 - - $7,125
-
gal
- -
10 4.311: Schedule deliveries according to demand $69,350 $25,000 - - - - $69,350
11 4.111: Add equipment/ operators to reduce production bottleneck $71,880 $4,000 - - - $71,880 -
12 4.112: Replace old machine with new automatic multi-station tool $27,940 $70,000 n/a - - - $27,940 -
13 4.112: Replace old machine with new automatic multi-station tool $28,080 $7,000 - - - $28,080 -
TOTAL RECOMMENDED $346,383 $165,820 $122,744
1,478,556
kWh
$19,264
-
kW-mo/yr
$7,125
-
gal
$127,900 $69,350
TOTAL IMPLEMENTED $182,830 $50,580 $92,211
1,117,556
kWh
$14,144
-
kW-mo/yr
$7,125
-
gal
- $69,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs