Assessment Year | 2001 |
---|---|
Principal Product | Aluminum extrusion |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 168 |
Plant Area |
130,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $294,559 | 5,163,491 |
kWh
|
$0.057 |
Electricity Demand | $140,790 | 14,264 |
kW-mo/yr
|
$9.87 |
Electricity Fees | $25,669 | - |
|
- |
Natural Gas | $77,363 | 15,359 |
MMBtu
|
$5.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $381,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $87,448 | $164,000 |
$61,593
1,080,585
kWh
|
$25,855
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,045 | $640 |
$4,258
74,705
kWh
|
$1,787
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7145: Install skylights | $37,045 | $37,000 |
$16,397
287,661
kWh
|
$20,648
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $802 | $2,200 |
$663
11,625
kWh
|
$139
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2424: Use heat in flue gases to preheat products or materials | $21,960 | $30,000 | - | - |
$21,960
-
MMBtu
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $10,178 | $2,300 |
$6,526
114,492
kWh
|
$3,652
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,754 | $8,000 | - | - | - | - | - | $3,754 | |
08 | 4.446: Automate finishing process | $100,600 | $120,000 | - | - | - | $105,600 | $(-5,000.0) | - | |
09 | 4.441: Install automatic packing equipment | $113,800 | $80,000 | - | - | - | $118,800 | $(-5,000.0) | - | |
TOTAL RECOMMENDED | $381,632 | $444,140 |
$89,437
1,569,068
kWh
|
$52,081
-
kW-mo/yr
|
$21,960
-
MMBtu
|
$224,400 | $(-10,000.0) | $3,754 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs