Assessment Year | 2001 |
---|---|
Principal Product | Awards and trophies |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 484 |
Plant Area |
250,000
ft2
|
Annual Production | 53,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $375,995 | 7,519,857 |
kWh
|
$0.050 |
Electricity Demand | $168,640 | 17,252 |
kW-mo/yr
|
$9.78 |
Electricity Fees | $5,091 | - |
|
- |
Natural Gas | $66,108 | 11,268 |
MMBtu
|
$5.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,226,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $4,842 | $1,000 |
$3,502
70,039
kWh
|
$1,340
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,972 | $700 |
$2,148
42,969
kWh
|
$824
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $4,366 | $7,000 |
$3,156
63,112
kWh
|
$1,210
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,446 | $18,000 | n/a |
$8,984
179,689
kWh
|
$2,462
-
kW-mo/yr
|
- | - | - | - | - |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $4,210 | - | - |
$4,210
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7145: Install skylights | $34,893 | $12,500 |
$13,768
275,369
kWh
|
$21,125
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,523 | $1,080 |
$3,992
79,851
kWh
|
$1,531
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,888 | $5,400 | - | - | - | - | $(-100.0) | - | $2,988 | |
09 | 3.1175: Use a different or recycled raw material | $45,000 | - | - | - |
$45,000
-
lb
|
- | - | - | - | |
10 | 3.5311: Recover and reuse waste material | $312,500 | $20,000 | - | - | - | - | - | $312,500 | - | |
11 | 4.445: Install equipment to move product | $73,440 | $1,500 | - | - | - | $73,440 | - | - | - | |
12 | 4.441: Install automatic packing equipment | $144,380 | $35,000 | - | - | - | $146,880 | $(-2,500.0) | - | - | |
13 | 4.446: Automate finishing process | $41,960 | $80,000 | - | - | - | $48,960 | $(-7,000.0) | - | - | |
14 | 4.652: Replace existing equipment with more suitable substitutes | $6,420 | - | - | - | - | $6,120 | - | - | $300 | |
15 | 4.444: Install system to collect scrap | $73,440 | $12,000 | - | - | - | $73,440 | - | - | - | |
16 | 4.441: Install automatic packing equipment | $68,440 | $60,000 | - | - | - | $73,440 | $(-5,000.0) | - | - | |
17 | 4.311: Schedule deliveries according to demand | $390,000 | $210,000 | - | - | - | - | - | - | $390,000 | |
TOTAL RECOMMENDED | $1,226,720 | $464,180 |
$35,550
711,029
kWh
|
$32,702
-
kW-mo/yr
|
$45,000
-
lb
|
$422,280 | $(-14,600.0) | $312,500 | $393,288 | ||
TOTAL IMPLEMENTED | $49,468 | $14,580 |
$21,262
425,259
kWh
|
$28,206
-
kW-mo/yr
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs