Assessment Year | 2001 |
---|---|
Principal Product | Aluminum forgings for aerospace |
NAICS |
n/a
|
SIC | 3463: Nonferrous Forgings |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
150,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 4,725
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,790 | 5,253,011 |
kWh
|
$0.066 |
Electricity Demand | $174,280 | 18,770 |
kW-mo/yr
|
$9.29 |
Electricity Fees | $7,896 | - |
|
- |
Natural Gas | $332,900 | 66,651 |
MMBtu
|
$4.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,607,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $89,479 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $22,159 | $5,200 |
$16,334
246,739
kWh
|
$5,825
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4323: Use optimum size and capacity equipment | $24,052 | $18,000 | - | - |
$24,052
-
MMBtu
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $54,857 | $120,000 |
$49,562
748,678
kWh
|
$5,295
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,213 | $400 |
$3,843
58,054
kWh
|
$1,370
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,172 | $7,600 |
$3,813
57,592
kWh
|
$1,359
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,078 | $2,000 | - | - |
$2,078
-
MMBtu
|
- | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $1,318 | $2,550 |
$653
9,870
kWh
|
$665
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,288,713 | $1,830,400 |
$402,254
6,076,350
kWh
|
$143,363
-
kW-mo/yr
|
$424,695
-
MMBtu
|
- | - | $318,401 | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,638 | $15,000 | - | - | - | - | - | $6,638 | |
10 | 4.446: Automate finishing process | $196,800 | $56,000 | - | - | - | $211,800 | $(-15,000.0) | - | |
TOTAL RECOMMENDED | $1,607,000 | $2,057,150 |
$476,459
7,197,283
kWh
|
$157,877
-
kW-mo/yr
|
$450,825
-
MMBtu
|
$211,800 | $(-15,000.0) | $325,039 | ||
TOTAL IMPLEMENTED | $89,479 | $135,200 |
$73,552
1,111,063
kWh
|
$13,849
-
kW-mo/yr
|
$2,078
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs