ITAC Assessment: SD0258
ITAC logo
ITAC Assessment: SD0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product seed dispersers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $485,428 9,847,597
kWh
Electricity Demand $226,499 17,094
kW-mo/yr
Electricity Fees $2,084 -
Natural Gas $66,899 13,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $800,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $309,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $139,359 $30,480 $100,317
2,039,566
kWh
$39,042
-
kW-mo/yr
- - - -
02 2.2612: Use cooling tower water instead of refrigeration $66,333 $50,000 $39,348
800,117
kWh
$26,985
-
kW-mo/yr
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $5,169 $2,000 $1,626
33,118
kWh
$3,543
-
kW-mo/yr
- - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,957 - - $3,957
-
kW-mo/yr
- - - -
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,453 $8,250 - - $5,453
-
MMBtu
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,997 $12,500 - - - $3,997
-
lb
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,732 $7,900 - - - $5,732
-
lb
- -
08 4.446: Automate finishing process $387,150 $250,000 - - - - $387,150 -
09 4.652: Replace existing equipment with more suitable substitutes $32,513 $20,000 - - - - $32,513 -
10 4.441: Install automatic packing equipment $4,528 $3,294 - - - - $4,528 -
11 4.211: Consider use / purchase of bulk materials where possible $84,000 $40,000 - - - - - $84,000
12 4.445: Install equipment to move product $62,000 $20,000 n/a - - - - $62,000 -
TOTAL RECOMMENDED $800,191 $444,424 $141,291
2,872,801
kWh
$73,527
-
kW-mo/yr
$5,453
-
MMBtu
$9,729
-
lb
$486,191 $84,000
TOTAL IMPLEMENTED $309,118 $146,174 $141,291
2,872,801
kWh
$69,570
-
kW-mo/yr
- $9,729
-
lb
$4,528 $84,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs