Assessment Year | 2000 |
---|---|
Principal Product | ceramic materials for military and automobiles |
NAICS |
n/a
|
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
217,000
ft2
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $399,477 | 7,961,606 |
kWh
|
$0.050 |
Electricity Demand | $215,507 | 25,326 |
kW-mo/yr
|
$8.51 |
Electricity Fees | $10,444 | - |
|
- |
Natural Gas | $33,288 | 6,442 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,133 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $122,937 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $32,196 | $16,750 |
$21,280
424,091
kWh
|
$19,709
-
kW-mo/yr
|
$(-8,793.0)
-
MMBtu
|
- | - | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $21,676 | $27,000 |
$15,089
301,583
kWh
|
$6,587
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,428 | $6,300 |
$3,002
59,789
kWh
|
$426
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $5,271 | $3,000 |
$5,271
104,924
kWh
|
- | - | - | - | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,428 | $5,400 | - | - | - | - | - |
$3,428
-
lb
|
- | |
06 | 3.8143: Recycle cleaning solvent and reuse | $2,345 | - | - | - | - | - |
$2,345
-
gal
|
- | - | |
07 | 3.4115: Recover and reuse cooling water | $7,795 | $2,000 | - | - | - |
$7,795
-
Tgal
|
- | - | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,760 | - | - |
$11,760
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 4.446: Automate finishing process | $67,234 | $55,000 | - | - | - | - | - | - | $67,234 | |
TOTAL RECOMMENDED | $155,133 | $115,450 |
$44,642
890,387
kWh
|
$38,482
-
kW-mo/yr
|
$(-8,793.0)
-
MMBtu
|
$7,795
-
Tgal
|
$2,345
-
gal
|
$3,428
-
lb
|
$67,234 | ||
TOTAL IMPLEMENTED | $122,937 | $98,700 |
$23,362
466,296
kWh
|
$18,773
-
kW-mo/yr
|
- |
$7,795
-
Tgal
|
$2,345
-
gal
|
$3,428
-
lb
|
$67,234 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs