ITAC Assessment: BD0223
ITAC logo
ITAC Assessment: BD0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Water Teatment Equipment
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 450,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 52,416
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,782 14,892,339
kWh
Electricity Demand $395,106 28,808
kW-mo/yr
Electricity Fees $5,136 -
Natural Gas $189,345 29,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,812 $99,075 n/a $21,349
543,255
kWh
$14,333
-
kW-mo/yr
- $(-2,651.0) $(-8,219.0) -
02 2.7231: Use radiant heater for spot heating $33,379 $48,000 n/a - - $33,379
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,614 $190 $17,117
435,585
kWh
$11,497
-
kW-mo/yr
- - - -
04 2.4314: Use synthetic lubricant $5,325 $400 $3,186
81,064
kWh
$2,139
-
kW-mo/yr
- - - -
05 2.7145: Install skylights $4,521 $9,080 $1,854
47,174
kWh
$2,667
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $4,245 $1,050 $2,299
58,498
kWh
$1,946
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $392 $640 $261
6,645
kWh
$131
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $184 $875 $432
10,985
kWh
$206
-
kW-mo/yr
- $(-190.0) $(-264.0) -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,034 - $618
15,739
kWh
$416
-
kW-mo/yr
- - - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $36,770 $100 - - - - - $36,770
11 4.447: Automate payroll system $15,600 $2,500 - - - - - $15,600
TOTAL RECOMMENDED $154,876 $161,910 $47,116
1,198,945
kWh
$33,335
-
kW-mo/yr
$33,379
-
MMBtu
$(-2,841.0) $(-8,483.0) $52,370
TOTAL IMPLEMENTED $95,651 $14,835 $25,149
639,951
kWh
$18,586
-
kW-mo/yr
- $(-190.0) $(-264.0) $52,370
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs