ITAC Assessment: BS0124
ITAC logo
ITAC Assessment: BS0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pasta
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2041: Flour and Other Grain Mill Products
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 193,715
ft2
Annual Production 52,800,000
units
Production Hrs. Annual 7,296
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,343 4,903,159
kWh
Electricity Demand $74,471 12,091
kW-mo/yr
Natural Gas $161,220 22,707
MMBtu
Waste Disposal Costs
Water Usage $23,730 4,640
Tgal
TOTAL YEARLY COSTS $617,764
RECOMMENDED SAVINGS* $28,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,766 $6,213 $4,158
56,953
kWh
$609
-
kW-mo/yr
-
02 2.2136: Install / repair insulation on steam lines $392 $1,259 - - $392
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,609 $1,030 $6,609
90,574
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,460 $2,200 $13,240
181,375
kWh
$3,220
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,228 $10,702 $24,007
328,902
kWh
$3,829
-
kW-mo/yr
$392
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs