ITAC Assessment: SF0137
ITAC logo
ITAC Assessment: SF0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Mass Flow Meters
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 23,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,854 460,727
kWh
Electricity Demand $9,315 2,374
kW-mo/yr
Natural Gas $1,285 177
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $800 $400 $622
7,913
kWh
$178
-
kW-mo/yr
02 2.7135: Install occupancy sensors $813 $1,920 $639
7,913
kWh
$174
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,861 $9,165 $3,070
38,394
kWh
$791
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $744 $3,630 $524
6,448
kWh
$220
-
kW-mo/yr
TOTAL RECOMMENDED $6,218 $15,115 $4,855
60,668
kWh
$1,363
-
kW-mo/yr
TOTAL IMPLEMENTED $744 $3,630 $524
6,448
kWh
$220
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs