ITAC Assessment: SD0228
ITAC logo
ITAC Assessment: SD0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Transducers
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 68,500
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,211 3,053,927
kWh
Electricity Demand $43,601 7,781
kW-mo/yr
Natural Gas $943 138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,410 $6,484 $12,190
174,678
kWh
$2,220
-
kW-mo/yr
- -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $5,156 $4,875 $3,579
51,290
kWh
$1,577
-
kW-mo/yr
- -
03 3.1191: Change procedures / equipment / operating conditions $8,513 $16,000 - - $8,513
-
lb
-
04 4.446: Automate finishing process $69,113 $11,500 - - - $69,113
05 4.821: Pay bills on time to avoid late fees $793 - - - - $793
TOTAL RECOMMENDED $97,985 $38,859 $15,769
225,968
kWh
$3,797
-
kW-mo/yr
$8,513
-
lb
$69,906
TOTAL IMPLEMENTED $15,203 $6,484 $12,190
174,678
kWh
$2,220
-
kW-mo/yr
- $793
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs