| Assessment Year | 1999 |
|---|---|
| Principal Product | metal plating |
| NAICS |
n/a
|
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $5 M to 10M |
| # of Employees | 78 |
| Plant Area |
n/a
|
| Annual Production | 48,000
pieces
|
| Production Hrs. Annual | 6,732
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $205,062 | 2,948,124 |
kWh
|
$0.070 |
| Electricity Demand | $61,509 | 7,742 |
kW-mo/yr
|
$7.94 |
| Natural Gas | $13,252 | 2,094 |
MMBtu
|
$6.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $157,758 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,078 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7144: Install spectral reflectors / delamp | $1,277 | $1,650 |
$843
12,016
kWh
|
$434
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,961 | $1,060 |
$9,906
142,438
kWh
|
$2,055
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $99,648 | $111,600 |
$107,328
1,542,497
kWh
|
$50,308
-
kW-mo/yr
|
$(-57,988.0)
-
MMBtu
|
- | - | - | |
| 04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $840 | - | - | - | - | - | - | $840 | |
| 05 | 3.3131: Use evaporation to concentrate material | $1,038 | $1,500 | - | - | - | - |
$1,038
-
lb
|
- | |
| 06 | 3.8133: Convert to aqueous cleaning | $6,009 | $6,009 | - | - | - |
$6,009
-
gal
|
- | - | |
| 07 | 4.446: Automate finishing process | $11,740 | $4,100 | - | - | - | - | - | $11,740 | |
| 08 | 4.514: Re-arrange equipment layout to reduce handling costs | $25,245 | $22,970 | - | - | - | - | - | $25,245 | |
| TOTAL RECOMMENDED | $157,758 | $148,889 |
$118,077
1,696,951
kWh
|
$52,797
-
kW-mo/yr
|
$(-57,988.0)
-
MMBtu
|
$6,009
-
gal
|
$1,038
-
lb
|
$37,825 | ||
| TOTAL IMPLEMENTED | $14,078 | $2,710 |
$10,749
154,454
kWh
|
$2,489
-
kW-mo/yr
|
- | - | - | $840 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs