ITAC Assessment: SD0202
ITAC logo
ITAC Assessment: SD0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Custom printed circuit boards
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 78
Plant Area 20,000
ft2
Annual Production 15,600
pieces
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,964 1,368,992
kWh
Electricity Demand $49,490 3,077
kW-mo/yr
Natural Gas $10,453 1,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $348,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,974 $2,150 $4,044
47,479
kWh
$2,165
-
kW-mo/yr
$(-1,235.0)
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,368 $9,111 $3,181
932,298
kWh
$2,187
-
kW-mo/yr
- - - -
03 2.7144: Install spectral reflectors / delamp $4,044 $3,060 $2,238
655,920
kWh
$1,806
-
kW-mo/yr
- - - -
04 2.7261: Install timers and/or thermostats $616 $1,020 $616
12,896
kWh
- - - - -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $678 $800 $272
5,569
kWh
$406
-
kW-mo/yr
- - - -
06 2.1221: Replace obsolete burners with more efficient ones $6,118 $3,035 - - $6,118
-
MMBtu
- - -
07 2.2414: Use waste heat from hot flue gases to preheat $604 $1,154 - - $604
-
MMBtu
- - -
08 3.5313: Increase amount of waste recovered for resale $1,456 - - - - $1,456
-
lb
- -
09 3.5313: Increase amount of waste recovered for resale $8,736 $2,000 - - - $8,736
-
lb
- -
10 3.6192: Use a less expensive method of waste removal $3,190 $2,000 - - - - $3,190 -
11 3.5315: Lease / purchase baler; sell cardboard to recycler $1,420 $500 - - - $1,420
-
lb
- -
12 3.1152: Use high quality scrap (low sulfur) to reduce hazardous sludge generation $3,394 $3,000 - - - $3,394
-
lb
- -
13 4.111: Add equipment/ operators to reduce production bottleneck $308,351 $900,000 - - - - - $308,351
TOTAL RECOMMENDED $348,949 $927,830 $10,351
1,654,162
kWh
$6,564
-
kW-mo/yr
$5,487
-
MMBtu
$15,006
-
lb
$3,190 $308,351
TOTAL IMPLEMENTED $20,170 $13,611 $3,181
932,298
kWh
$2,187
-
kW-mo/yr
- $11,612
-
lb
$3,190 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs