Assessment Year | 1998 |
---|---|
Principal Product | Custom printed circuit boards |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 78 |
Plant Area |
20,000
ft2
|
Annual Production | 15,600
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,964 | 1,368,992 |
kWh
|
$0.085 |
Electricity Demand | $49,490 | 3,077 |
kW-mo/yr
|
$16.08 |
Natural Gas | $10,453 | 1,371 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $348,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,170 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,974 | $2,150 |
$4,044
47,479
kWh
|
$2,165
-
kW-mo/yr
|
$(-1,235.0)
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,368 | $9,111 |
$3,181
932,298
kWh
|
$2,187
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7144: Install spectral reflectors / delamp | $4,044 | $3,060 |
$2,238
655,920
kWh
|
$1,806
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $616 | $1,020 |
$616
12,896
kWh
|
- | - | - | - | - | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $678 | $800 |
$272
5,569
kWh
|
$406
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1221: Replace obsolete burners with more efficient ones | $6,118 | $3,035 | - | - |
$6,118
-
MMBtu
|
- | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $604 | $1,154 | - | - |
$604
-
MMBtu
|
- | - | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $1,456 | - | - | - | - |
$1,456
-
lb
|
- | - | |
09 | 3.5313: Increase amount of waste recovered for resale | $8,736 | $2,000 | - | - | - |
$8,736
-
lb
|
- | - | |
10 | 3.6192: Use a less expensive method of waste removal | $3,190 | $2,000 | - | - | - | - | $3,190 | - | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,420 | $500 | - | - | - |
$1,420
-
lb
|
- | - | |
12 | 3.1152: Use high quality scrap (low sulfur) to reduce hazardous sludge generation | $3,394 | $3,000 | - | - | - |
$3,394
-
lb
|
- | - | |
13 | 4.111: Add equipment/ operators to reduce production bottleneck | $308,351 | $900,000 | - | - | - | - | - | $308,351 | |
TOTAL RECOMMENDED | $348,949 | $927,830 |
$10,351
1,654,162
kWh
|
$6,564
-
kW-mo/yr
|
$5,487
-
MMBtu
|
$15,006
-
lb
|
$3,190 | $308,351 | ||
TOTAL IMPLEMENTED | $20,170 | $13,611 |
$3,181
932,298
kWh
|
$2,187
-
kW-mo/yr
|
- |
$11,612
-
lb
|
$3,190 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs