Assessment Year | 2024 |
---|---|
Principal Product | Medical Services |
NAICS | 622110: General Medical and Surgical Hospitals |
SIC | 8062: General Medical and Surgical Hospitals |
Sales Range | $10 M to 50M |
# of Employees | 525 |
Plant Area |
71,178
ft2
|
Annual Production | 1,040
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $227,042 | 3,351,600 |
kWh
|
$0.068 | |
Electricity Demand | $92,038 | 6,957 |
kW-mo/yr
|
$13.23 | |
Natural Gas | $69,532 | 19,314 |
MMBtu
|
$3.60 | |
Waste Disposal Costs | |||||
Water Usage | $26,866 | 4,292 |
Tgal
|
$6.26 | |
Water Disposal | $11,449 | 4,292 |
Tgal
|
$2.67 | |
TOTAL YEARLY COSTS | $426,927 | ||||
RECOMMENDED SAVINGS* | $48,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $35,465 | $327,600 |
$35,465
521,544
kWh
|
- | |
02 | 2.7314: Reduce ventilation air | $3,939 | - |
$3,939
57,927
kWh
|
- | |
03 | 2.1212: Operate boilers on high fire setting | $3,357 | $16,000 | - |
$3,357
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,371 | $9,240 | - |
$4,371
-
MMBtu
|
|
05 | 2.6211: Conserve energy by efficient use of vending machines | $304 | $278 |
$304
4,473
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $223 | - |
$223
3,285
kWh
|
- | |
07 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $609 | $17,437 |
$368
5,415
kWh
|
$241
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,268 | $370,555 |
$40,299
592,644
kWh
|
$7,969
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs