ITAC Assessment: OK1114
ITAC logo
ITAC Assessment: OK1114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Medical Services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 525
Plant Area 71,178
ft2
Annual Production 1,040
units
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,042 3,351,600
kWh
Electricity Demand $92,038 6,957
kW-mo/yr
Natural Gas $69,532 19,314
MMBtu
Waste Disposal Costs
Water Usage $26,866 4,292
Tgal
Water Disposal $11,449 4,292
Tgal
TOTAL YEARLY COSTS $426,927
RECOMMENDED SAVINGS* $48,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $35,465 $327,600 $35,465
521,544
kWh
-
02 2.7314: Reduce ventilation air $3,939 - $3,939
57,927
kWh
-
03 2.1212: Operate boilers on high fire setting $3,357 $16,000 - $3,357
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $4,371 $9,240 - $4,371
-
MMBtu
05 2.6211: Conserve energy by efficient use of vending machines $304 $278 $304
4,473
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $223 - $223
3,285
kWh
-
07 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $609 $17,437 $368
5,415
kWh
$241
-
MMBtu
TOTAL RECOMMENDED $48,268 $370,555 $40,299
592,644
kWh
$7,969
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs