Assessment Year 2002
Principal Product Deep fryers
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 250,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,546 9,725,750
kWh
Electricity Demand $87,694 15,944
kW-mo/yr
Electricity Fees $19,530 -
Natural Gas $185,977 26,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,222 $10,500 $22,329
542,220
kWh
- $893 -
02 2.2414: Use waste heat from hot flue gases to preheat $17,996 $32,600 - - - $17,996
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $6,584 - $5,249
127,476
kWh
$1,082
-
kW-mo/yr
$253 -
04 2.3212: Optimize plant power factor $5,475 $10,500 - $5,264
-
kW-mo/yr
$211 -
05 2.7111: Reduce illumination to minimum necessary levels $3,293 - $2,625
63,738
kWh
$541
-
kW-mo/yr
$127 -
TOTAL RECOMMENDED $56,570 $53,600 $30,203
733,434
kWh
$6,887
-
kW-mo/yr
$1,484 $17,996
-
MMBtu
TOTAL IMPLEMENTED $46,693 $53,600 $22,329
542,220
kWh
$5,264
-
kW-mo/yr
$1,104 $17,996
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs