ITAC Assessment: SD0187
ITAC logo
ITAC Assessment: SD0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Packaging Materials for Commercial Vendors
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 103,843
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,370 4,220,985
kWh
Electricity Demand $120,616 10,542
kW-mo/yr
Natural Gas $2,348 360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $480,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $2,309 $3,660 $1,085
41,618
kWh
$1,224
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,982 $500 $2,118
81,477
kWh
$1,864
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,566 - $1,897
72,978
kWh
$1,669
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $1,433 $2,400 $1,433
55,100
kWh
- - -
05 3.5213: Reuse scrap printed paper for make-ready $32,700 - - - $32,700 -
06 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $436,850 $405,000 - - - $436,850
TOTAL RECOMMENDED $480,840 $411,560 $6,533
251,173
kWh
$4,757
-
kW-mo/yr
$32,700 $436,850
TOTAL IMPLEMENTED $11,290 $6,560 $6,533
251,173
kWh
$4,757
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs