| Assessment Year | 1998 |
|---|---|
| Principal Product | Packaging Materials for Commercial Vendors |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
103,843
ft2
|
| Annual Production | 100,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $110,370 | 4,220,985 |
kWh
|
$0.026 |
| Electricity Demand | $120,616 | 10,542 |
kW-mo/yr
|
$11.44 |
| Natural Gas | $2,348 | 360 |
MMBtu
|
$6.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $480,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,290 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,309 | $3,660 |
$1,085
41,618
kWh
|
$1,224
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,982 | $500 |
$2,118
81,477
kWh
|
$1,864
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,566 | - |
$1,897
72,978
kWh
|
$1,669
-
kW-mo/yr
|
- | - | |
| 04 | 2.7261: Install timers and/or thermostats | $1,433 | $2,400 |
$1,433
55,100
kWh
|
- | - | - | |
| 05 | 3.5213: Reuse scrap printed paper for make-ready | $32,700 | - | - | - | $32,700 | - | |
| 06 | 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance | $436,850 | $405,000 | - | - | - | $436,850 | |
| TOTAL RECOMMENDED | $480,840 | $411,560 |
$6,533
251,173
kWh
|
$4,757
-
kW-mo/yr
|
$32,700 | $436,850 | ||
| TOTAL IMPLEMENTED | $11,290 | $6,560 |
$6,533
251,173
kWh
|
$4,757
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs