Assessment Year | 1997 |
---|---|
Principal Product | Manufacture transducers |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
94,000
ft2
|
Annual Production | 35,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,388 | 2,929,367 |
kWh
|
$0.052 |
Electricity Demand | $76,565 | 7,666 |
kW-mo/yr
|
$9.99 |
Natural Gas | $5,740 | 999 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,704 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $1,327 | $150 |
$976
18,757
kWh
|
$351
-
kW-mo/yr
|
- | - | - | |
02 | 2.6224: Schedule baking times of small and large components | $1,309 | - |
$592
11,430
kWh
|
$717
-
kW-mo/yr
|
- | - | - | |
03 | 2.1221: Replace obsolete burners with more efficient ones | $2,049 | $2,500 | - | - |
$2,049
-
MMBtu
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $551 | $150 |
$333
6,448
kWh
|
$218
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,528 | $8,640 |
$1,822
35,170
kWh
|
$706
-
kW-mo/yr
|
- | - | - | |
06 | 2.7144: Install spectral reflectors / delamp | $15,269 | $18,810 |
$9,584
184,349
kWh
|
$5,685
-
kW-mo/yr
|
- | - | - | |
07 | 3.8224: Convert to less toxic hydrocarbon cleaners | $6,500 | - | - | - | - |
$6,500
-
gal
|
- | |
08 | 2.4314: Use synthetic lubricant | $2,877 | - | - | - | - |
$2,877
-
gal
|
- | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $40,000 | $150,000 | - | - | - | - | $40,000 | |
TOTAL RECOMMENDED | $72,410 | $180,250 |
$13,307
256,154
kWh
|
$7,677
-
kW-mo/yr
|
$2,049
-
MMBtu
|
$9,377
-
gal
|
$40,000 | ||
TOTAL IMPLEMENTED | $10,704 | $150 |
$976
18,757
kWh
|
$351
-
kW-mo/yr
|
- |
$9,377
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs