ITAC Assessment: UA0238
ITAC logo
ITAC Assessment: UA0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 150,000
ft2
Annual Production 8,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $724,613 12,702,994
kWh
Electricity Demand $116,446 23,893
kW-mo/yr
TOTAL YEARLY COSTS $841,059
RECOMMENDED SAVINGS* $166,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $166,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4133: Use most efficient type of electric motors $161,890 $279,811 $128,413
2,251,283
kWh
$32,400
-
kW-mo/yr
$1,077
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,488 $5,859 $3,265
57,239
kWh
$200
-
kW-mo/yr
$23
03 2.7232: Replace existing hvac unit with high efficiency model $1,093 $16,210 $789
13,829
kWh
$297
-
kW-mo/yr
$7
TOTAL RECOMMENDED $166,471 $301,880 $132,467
2,322,351
kWh
$32,897
-
kW-mo/yr
$1,107
TOTAL IMPLEMENTED $166,471 $301,880 $132,467
2,322,351
kWh
$32,897
-
kW-mo/yr
$1,107
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs