ITAC Assessment: SD0175
ITAC logo
ITAC Assessment: SD0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fire Extinguishers for aircraft
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 73,800
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 5,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,472 1,748,828
kWh
Electricity Demand $72,100 5,656
kW-mo/yr
Natural Gas $7,624 1,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $193,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $191,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7261: Install timers and/or thermostats $19,778 $6,900 $19,778
295,135
kWh
- - - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $2,240 $6,840 $2,240
33,411
kWh
- - - -
03 3.1175: Use a different or recycled raw material $81,900 - - - - - $81,900
04 3.5315: Lease / purchase baler; sell cardboard to recycler $21,425 $7,000 - - $21,425
-
lb
- -
05 3.8224: Convert to less toxic hydrocarbon cleaners $6,658 - - $6,658
-
gal
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,325 $9,000 - - - $6,325 -
07 2.4314: Use synthetic lubricant $1,789 - - $1,789
-
gal
- - -
08 4.111: Add equipment/ operators to reduce production bottleneck $53,570 - - - - $53,570 -
TOTAL RECOMMENDED $193,685 $29,740 $22,018
328,546
kWh
$8,447
-
gal
$21,425
-
lb
$59,895 $81,900
TOTAL IMPLEMENTED $191,896 $29,740 $22,018
328,546
kWh
$6,658
-
gal
$21,425
-
lb
$59,895 $81,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs