ITAC Assessment: SD0164
ITAC logo
ITAC Assessment: SD0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Products for Food Industry
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 475
Plant Area 257,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,224,852 20,872,509
kWh
Electricity Demand $403,002 42,798
kW-mo/yr
Natural Gas $159,649 45,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $841,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $576,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $50,256 $53,800 $39,225
665,006
kWh
$11,031
-
kW-mo/yr
- - - - - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $241,567 $538,000 $187,219
3,174,091
kWh
$54,348
-
kW-mo/yr
- - - - - - -
03 2.1224: Replace boiler $204,328 $78,000 $169,920
2,880,715
kWh
$43,008
-
kW-mo/yr
- - - - - - $(-8,600.0)
04 2.2442: Preheat combustion air with waste heat $17,052 $9,016 - - $17,052
-
MMBtu
- - - - - -
05 2.4226: Use / purchase optimum sized compressor $9,242 $1,500 $6,348
107,562
kWh
$2,894
-
kW-mo/yr
- - - - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $704 - $704
12,016
kWh
- - - - - - - -
07 3.3128: Utilize other methods to remove contaminants $47,553 $80,200 - - - $3,770
-
Tgal
- $23,783
-
gal
- $20,000 -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,700 $15,000 - - - - $13,700
-
gal
- - - -
09 3.5313: Increase amount of waste recovered for resale $11,250 - - - - - - - $11,250
-
lb
- -
10 3.5313: Increase amount of waste recovered for resale $10,000 - - - - - - - $10,000
-
lb
- -
11 3.5313: Increase amount of waste recovered for resale $6,000 - - - - - - - - - $6,000
12 3.8224: Convert to less toxic hydrocarbon cleaners $496 - - - - - - $496
-
gal
- - -
13 4.513: Re-arrange equipment layout to reduce labor costs $164,025 $20,000 - - - - - - - - $164,025
14 3.1191: Change procedures / equipment / operating conditions $29,160 $1,000 - - - - - - - - $29,160
15 3.1191: Change procedures / equipment / operating conditions $36,450 $8,000 - - - - - - - - $36,450
TOTAL RECOMMENDED $841,783 $804,516 $403,416
6,839,390
kWh
$111,281
-
kW-mo/yr
$17,052
-
MMBtu
$3,770
-
Tgal
$13,700
-
gal
$24,279
-
gal
$21,250
-
lb
$20,000 $227,035
TOTAL IMPLEMENTED $576,202 $631,316 $233,496
3,958,675
kWh
$68,273
-
kW-mo/yr
$17,052
-
MMBtu
- - $496
-
gal
$21,250
-
lb
- $235,635
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs